Project Brief

A heritage building required major demolition, structural work, fitout and restoration. A new floor design was reinstated with the installation of a new floor structure through 6 levels.  Other installations included a mobility lift, a new 7 level lift and 6 new access consultant designed ambulant bathrooms. Other work completed was the construction of a new roof terrace deck and exterior façade painting.