Project Brief

Stage One – New House Construction on edge of mountain at 45 degrees incline, structure consists of suspended concrete slabs up to 14m height with core filled blockwork & 6 car garage with incline lift cut and excavated onto the stone bedrock. Onsite construction included 90 % hand excavation due to site accessibility.